Strategic Maintenance Planning & Scheduling
From Reactive Firefighting to Proactive Reliability: Mastering Maintenance Planning, Backlog Control, and Wrench Time Optimization
Transform reactive maintenance into a structured, proactive work management system. Master executable job plans, backlogs, and weekly schedules.
2nd – 4th November 2026 Dammam, Saudi Arabia
Key Learning Outcomes
By the end of this training, participants will be able to:
Differentiate maintenance planning from scheduling and manage both as separate, vital disciplines.
Develop complete, executable job packages with realistic labor and resource estimates.
Build, analyze, and optimize maintenance backlogs for improved workload visibility and tracking.
Create practical weekly maintenance schedules aligned with available resources and production requirements.
Effectively plan and execute shutdowns, turnarounds, and outages while minimizing delays and cost overruns.
Utilize CMMS data and key maintenance KPIs to develop a proactive maintenance roadmap.
Why You Should Attend?
Gain practical, implementation-focused knowledge through real-world workshops rather than theory alone.
Increase Efficiency
Improve maintenance planning and scheduling to reduce downtime and increase operational efficiency.
Minimize Costs
Minimize overtime, emergency work, expedited parts, and overall maintenance costs significantly.
Practical Tools
Leave with ready-to-use tools, templates, and a 90-day improvement roadmap for your organization.
Master Outages
Strengthen shutdown and turnaround planning to deliver complex projects on time and within budget.
Training Agenda
3-Day Comprehensive Programme
- The real difference between planning and scheduling.
- The proactive work management cycle.
- Economics of no planning: wrench time & overtime.
- Roles and accountability: planner vs supervisor.
- Workshop: Rate your own planning function maturity.
- Work request quality standards.
- Criticality-based prioritization strategies.
- Reading backlog health and hidden work.
- Balancing corrective vs. preventive work.
- Workshop: Build a prioritization matrix and calculate backlog weeks.
- Job scoping: turning vague requests into execution.
- Estimating craft hours accurately.
- The job package: instructions, BOM, safety, permits.
- Job kitting, parts staging & plan libraries.
- Workshop: Build a complete job package for a real plant job.
- Scheduling to capacity: forecasting craft hours.
- The weekly schedule & daily coordination meetings.
- Negotiating equipment access with production.
- Absorbing break-in and emergency work safely.
- Workshop: Build a weekly schedule against capacity constraints.
- Why turnarounds overrun and cost control failures.
- Scope freeze & critical path sequencing.
- Resource, contractor, and material readiness.
- Execution control and post-event reviews.
- Workshop: Build a critical-path readiness checklist.
- CMMS structure for real planning and scheduling.
- AI-assisted planning vs vendor hype.
- Metrics that matter: wrench time, PM compliance.
- Cost visibility and reactive-to-proactive transition.
- Workshop: Build a 90-day plan & dashboard.
Who Should Attend?
- Maintenance Planners & Schedulers responsible for structuring daily and weekly workloads.
- Maintenance Supervisors, Team Leaders, and Shift Leaders managing frontline execution.
- Maintenance, Reliability Engineers & Managers focused on asset uptime and failure prevention.
- Plant Managers, Asset Managers & Shutdown Coordinators overseeing site-wide turnarounds.
- CMMS/EAM Key Users & Continuous Improvement Professionals responsible for data hygiene and performance excellence.
Investment & Registration
Event Code: CS-MPS-005 | 2nd – 4th November 2026 | Dammam, Saudi Arabia
Delegate 1
USD 2,295Book 1 delegate
Early Bird (Before 18 Oct 2026)
Group
USD 2,045Book 2 to 4 delegates
Early Bird · Best Value
Corporate
USD 1,795Book 5 or more
Early Bird · Excl. taxes
Enrollment Request
Payment is required within 5 working days of receiving the invoice.